got my lowering kit frm honda 2day an was reading the instructions an it says 2 tighten the nuts with the load on an 2 follow the sequence shown in sketches supplied but it jus shows u wot bolts 2 tightenit doesnt giv a sequence, like tighten this 1 1st then this 1 etc, is ther a sequence they hav 2 b tightened in, oh and i think my kit is 1 10mm lock nut missin but il get 1 at the autoparts